Hydropower Plant Agkistro II

The project was completed in two phases. In the first phase, the designed capacity of the plant was 0.65MW, and in the second phase, extra 0,25 MW was installed, increasing the total power of the plant to 0,9 MW. The investment was included in the Operational Programme for Energy.

  • County / Region: Serres
  • Installed Capacity MW: 0,9 MW
  • Number of turbines: 2
  • Type turbines: Francis
  • Opening: Early 2002